Site Map
- Consulting
- Performance Coaching
- Services
- Newsletters
- Subscribe to Newsletters
- What’s New
- About Us
- Contact Us
- Login
- Free Resources
- Downloads
- About John de Wardt
- Industry Involvement
- Strategic Planning
- Business Planning
- Lean Manufacturing
- Lean Drilling™
- Lean Manufacturing Applications in Oil & Gas
- Project Management
- Value Delivery Systems
- Operations Management
- Lean Drilling History
- Diagnostics
- Testimonials
- Clients
- Results
- Lean Manufacturing Case Studies
- Strategic Planning Case Studies
- Lean Drilling™ Case Studies
- Terminology
- Publications
- Performance Improvement Processes
Search
Testimonials
His recent corporate strategy development work resulted in a set of strategic initiatives that are already beginning to deliver value only a few months into their implementation.
John de Wardt provided us with a straight forward, hard driving, no nonsense approach to strategic planning that is still helping us define and achieve new business goals.
We have seen significant improvements in results and have adopted the principles in our planning and operations efforts.
...substantial improvement in product delivery and resultant reductions of inventory. The catalyst for these new processes was the Strategic Planning workshop lead by John de Wardt.
His insight into the oil and gas industry is invaluable, and his knowledge of best practice in manufacturing has added measurable value to several of our investments.
John’s emphasis on rigorous planning has resulted in tangible and measurable results in the area of drilling and completing wells. A true step-change.
Case Studies
Pressure Vessel Fabrication Time Cut by 27%
A "Design to Build" process improvement program cut the manufacturing time of very large diameter heavy tar sands processing vessels by 27% with an aggressive goal to continue the reduction.
Fabrication Shop Increases Throughput 50%
A heavy engineering fabrication shop was reorganized with improved techniques that increased weld metal lay down time as well as a devoted material preparation area. The result was an immediate 50% improvement in throughput.
